You are here


Design for Manufacture and Test (DfM / DfT)

Insyte manufacturing has identified £42M of cost savings over 25 major projects through early involvement in Design for Manufacture and Test (DfM/DfT).

Design for manufacture and test

Design for manufacture and test

Additional benefits realised are projects delivered ahead of time, under budget and with no design changes during early production.

Key Performance Features

  • Reduce costs, lead-time and part count.
  • Improve reliability and yield.
  • Enhanced producibility, testability and functionality.
  • Web based PEC producibility checklist for categorising key areas likely to affect manufacture and test.

Contact

Alan Colquhoun – Principal Engineer DfM
alan.colquhoun@baesystems.com
+44 (0) 1383 836096

Facility Location

North Way,
Hillend Ind Park,
nr Dunfermline,
Fife,
KY11 9HQ


Colophon